Difference between revisions of "July 6, 2020 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 29: | Line 29: | ||
#* Revisting Roman's [https://web-docs.gsi.de/~rdzhigad/www/research/track-correction track rotation scan]? | #* Revisting Roman's [https://web-docs.gsi.de/~rdzhigad/www/research/track-correction track rotation scan]? | ||
# [https://halldweb.jlab.org/wiki/index.php/April_20-21,_2020_DIRC#Action_items Follow-up on additional action items from workfest] (All) | # [https://halldweb.jlab.org/wiki/index.php/April_20-21,_2020_DIRC#Action_items Follow-up on additional action items from workfest] (All) | ||
+ | #* 100M event MC samples required for ρ and φ data/MC comparisons: | ||
+ | #** /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root | ||
+ | #** /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root | ||
# AOB | # AOB |
Revision as of 11:57, 6 July 2020
Meeting Information
GlueX DIRC Meeting
Monday July 6, 2020
1:00 pm, EDT
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- JLab MEDCON5 and planning for 6-week summer run (beginning July 27)
- DIRC startup plans for summer run (Bill, Justin, All)
- Access to Hall D on Tuesday to check dark cover and restart electronics
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 monitoring and data production status (Justin)
- Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies
- Files being combined at /volatile/halld/home/jrsteven/RunPeriod-2019-11/offline_monitoring/ver12_pass07/hd_root_data.root
- Monitoring launch ver14: TOF timing shifts not reflected in DIRC time offsets. Fix in CCDB (Justin)
- Monitoring launch ver12 completed (10 files from each run): used to check time offsets by run and initial PID studies
- Geometric reconstruction update (Ahmed/Roman)
- FastDIRC update (Yunjie)
- Revisting Roman's track rotation scan?
- Spring 2020 monitoring and data production status (Justin)
- Follow-up on additional action items from workfest (All)
- 100M event MC samples required for ρ and φ data/MC comparisons:
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
- 100M event MC samples required for ρ and φ data/MC comparisons:
- AOB