Difference between revisions of "Run Planning Meeting Notes, August 13 -17, 2020"
From GlueXWiki
(→Thursday, August 13) |
(→Thursday, August 13) |
||
Line 16: | Line 16: | ||
# Run Plan | # Run Plan | ||
#* Production | #* Production | ||
− | #* Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock, 350nA beam will trip AD00. | + | #* Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock (Hall A is off in the same time), 350nA beam will trip AD00. |
#* CPP installation: | #* CPP installation: | ||
#** CPP's preference: schedule the CPP test after Aug 21. | #** CPP's preference: schedule the CPP test after Aug 21. |
Revision as of 08:15, 13 August 2020
<- Back to Run Coordination Meetings:Summer2020
Thursday, August 13
- Last 24 hours
- Unstable beam yesterday swing shift: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.
- Diamond alignment completed by Hovanes during his shift
- TAGH scan completed by Sasha during his shift [1]
- Reports/Issues
- Monitoring link (Twice a day monitoring line) is slow last night.
- DIRC LV tripped due to the cur off during night
- Run Plan
- Production
- Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock (Hall A is off in the same time), 350nA beam will trip AD00.
- CPP installation:
- CPP's preference: schedule the CPP test after Aug 21.
- Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
- Pending issues:
- TagM card issue.