Difference between revisions of "Run Planning Meeting Notes, August 13 -17, 2020"
From GlueXWiki
(→Thursday, August 13) |
|||
Line 9: | Line 9: | ||
# Last 24 hours | # Last 24 hours | ||
#* Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available. | #* Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available. | ||
+ | #* Stable beam established after 7:30 pm yesterday. | ||
#* Diamond alignment completed by Hovanes during his shift | #* Diamond alignment completed by Hovanes during his shift | ||
#* TAGH scan completed by Sasha during his shift [https://logbooks.jlab.org/entry/3826230] | #* TAGH scan completed by Sasha during his shift [https://logbooks.jlab.org/entry/3826230] |
Revision as of 08:16, 13 August 2020
<- Back to Run Coordination Meetings:Summer2020
Thursday, August 13
- Last 24 hours
- Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.
- Stable beam established after 7:30 pm yesterday.
- Diamond alignment completed by Hovanes during his shift
- TAGH scan completed by Sasha during his shift [1]
- Reports/Issues
- Monitoring link (Twice a day monitoring line) is slow last night.
- DIRC LV tripped due to the cur off during night
- Run Plan
- Production
- Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock (Hall A is off in the same time), 350nA beam will trip AD00.
- CPP installation:
- CPP's preference: schedule the CPP test after Aug 21.
- Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
- Pending issues:
- TagM card issue.