General logbook entries:
- Lubomir's status on 9/1/2020: [1]
Straight-track data
- For alignment of the GEM/TRD we need to acquire production samples with the magnetic field off
- Straight-track sample at the center positions with the full GEM readout for tracking and alignment studies
- Runs - taken with FCAL_TRACK_CENT20_m9_TRDm10 configuration
- Logbook entries:
- Runs - taken with FCAL_TRACK_CENT20_m9_TRDm10 configuration
Full GEM readout: tracking mode
- At least one large dataset at each of the 3 TRD positions will be required with the full readout for tracking and alignment studies with the full solenoid field
- Runs 70951-70992 taken with FCAL_TRACK_CENTER configuration