Line 1: | Line 1: | ||
− | '''Below | + | '''Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021''' |
− | Spring/Summer 2021''' | + | |
− | # Aligning FCAL in the Hall; moving by about 5 mm on X to make sure that the | + | # Aligning FCAL in the Hall; moving by about 5 mm on X to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the |
− | beam goes through the middle of the hole. The exact position should be confirmed by the | + | the alignment group -- '''Tim Whitlatch''' |
− | the alignment group -- Tim Whitlatch | + | |
[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings] | [https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings] |
Revision as of 16:01, 10 September 2020
Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021
- Aligning FCAL in the Hall; moving by about 5 mm on X to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the
the alignment group -- Tim Whitlatch