;Aligning FCAL in the Hall | ;Aligning FCAL in the Hall | ||
: Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the alignment group -- '''Tim Whitlatch''' | : Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the alignment group -- '''Tim Whitlatch''' | ||
+ | |||
+ | ;Perform preventive replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events. | ||
[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings] | [https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings] |
Revision as of 16:15, 10 September 2020
Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021
- Aligning FCAL in the Hall
- Moving FCAL by about 5 mm in X-direction to make sure that the beam goes through the middle of the hole. The exact position should be confirmed by the alignment group -- Tim Whitlatch
- Perform preventive replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events.