;Refurbish CCAL active bases <span style="color:brown"> -- Support needed from Chris Stanislav and Fernando Barbosa </span> | ;Refurbish CCAL active bases <span style="color:brown"> -- Support needed from Chris Stanislav and Fernando Barbosa </span> | ||
− | : manufacture 150 new active bases according to modifications by V. Popov and install them on the CCAL | + | : manufacture 150 new active bases according to recent modifications by V. Popov and install them on the CCAL |
− | : Chris has already prepared a new PCB design | + | : Chris has already prepared a new PCB design for the active base |
Revision as of 17:21, 10 September 2020
Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021
- Aligning FCAL in the Hall -- Coordinated by Tim Whitlatch
- Moving FCAL platform by about 5 mm in X-direction to make sure that the beam goes through the middle of the FCAL hole (3x3 modules). The exact position of the platform should be confirmed by the alignment group
- Perform preventative replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events -- Support needed from Chris Stanislav, Fernando Barbosa, Matt Shepherd
- Several bases have already been replaced in this area. The status of FCAL bases in the 3 inner FCAL rings was provided by Colin and is presented in the link below
- Status of FCAL dividers in 3 inner rings
- Perform preventative maintenance of FCAL bases, which draw excessive current -- Support needed from Chris Stanislav, Fernando Barbosa, Matt Shepherd
- Diagnose and subsequently replace (reapair) bases which draw excessive current (typically larger than 15 mA), which is an indication of the possible failure of the base. Currently about 200 - 300 FCAL bases exhibit such a big current.
- Refurbish CCAL active bases -- Support needed from Chris Stanislav and Fernando Barbosa
- manufacture 150 new active bases according to recent modifications by V. Popov and install them on the CCAL
- Chris has already prepared a new PCB design for the active base