(Created page with "RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle Dung the last 6 days of the beam, we took production data and carried out two tests: PS ans CCAL. # Physics production: total...") |
|||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle | RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle | ||
− | Dung the last 6 days of the | + | Dung the last 6 days of the summer run, the beam was stable and we took production data, and carried out two tests: PS and CCAL. The downtime was 10.4hrs. |
− | + | ||
+ | * Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B | ||
+ | * PS study for flux normalization | ||
+ | * CCAL test with 2nA beam to test new active basis | ||
+ | |||
+ | The most notable issues were | ||
+ | |||
+ | * Goniometer controler board has to be replaced | ||
+ | * It was difficult to nudge the coherent peak probably because the diamond degraded | ||
+ | * Few FCAL bases have to be replaced | ||
+ | * Minor DAQ problem | ||
+ | * Persisting solenoid alarm which was solved by resetting the CCG | ||
+ | |||
+ | In the end, the setup was shutdown. |
Latest revision as of 09:13, 6 October 2020
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle
Dung the last 6 days of the summer run, the beam was stable and we took production data, and carried out two tests: PS and CCAL. The downtime was 10.4hrs.
- Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
- PS study for flux normalization
- CCAL test with 2nA beam to test new active basis
The most notable issues were
- Goniometer controler board has to be replaced
- It was difficult to nudge the coherent peak probably because the diamond degraded
- Few FCAL bases have to be replaced
- Minor DAQ problem
- Persisting solenoid alarm which was solved by resetting the CCG
In the end, the setup was shutdown.