Difference between revisions of "Π polarizability Meeting Dec 9, 2020"
From GlueXWiki
(→Minutes) |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 49: | Line 49: | ||
# Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]] | # Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]] | ||
# Announcements | # Announcements | ||
+ | # Action Items | ||
# [[CPP and NPP Readiness Review]] | # [[CPP and NPP Readiness Review]] | ||
#* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar] | #* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar] | ||
#* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments] | #* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments] | ||
+ | #* [[December 3, 2020 CPP Design Meeting |Dec 3 CPP Design Meeting]] | ||
#*[[GlueX-II and DIRC ERR]] (Example) | #*[[GlueX-II and DIRC ERR]] (Example) | ||
# Beam test | # Beam test | ||
Line 60: | Line 62: | ||
== Minutes == | == Minutes == | ||
− | '' Attending: | + | '' Attending: Beni, David, Ilya, Mark, Rory, Vambow, Elton |
+ | |||
+ | # Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]] | ||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # [[CPP and NPP Readiness Review]] | ||
+ | #* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar] | ||
+ | #* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments] | ||
+ | #* [[December 3, 2020 CPP Design Meeting |Dec 3 CPP Design Meeting]] | ||
+ | #*[[GlueX-II and DIRC ERR]] (Example) | ||
+ | #* Elton briefly summarized the CPP Design meeting and preparations for the Readiness Review | ||
+ | # Beam test | ||
+ | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding] (Ilya) | ||
+ | #* Beni: Hai has requested a Trigger Specification for discussions. He will work with Ilya to produce a document that can be provided to Hai | ||
+ | # Data Analysis (Andrew) | ||
+ | #* Andrew asked some technical questions about analysis. David and Elton will send some examples for fitting. | ||
+ | # Other business | ||
+ | # Next meeting | ||
+ | #* Dec 16. Rory: Use the time to Review status and preparations for the Readiness Review |
Latest revision as of 11:19, 9 December 2020
Contents
[hide]Meeting Info.
Meeting Time And Location
9:00 EST (JLab time)
REMOTE during Covid-19
Connecting
[Expand]
You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):
Action Items
- Output FCAL hits for muon generated events in MC (Andrew)
- Review TOF trigger requirements with Hai Dong (Beni and Ilya)
Agenda
- Previous meeting: Dec 2, 2020
- Announcements
- Action Items
- CPP and NPP Readiness Review
- Beam test
- Data Analysis (Andrew)
- Other business
- Next meeting
Minutes
Attending: Beni, David, Ilya, Mark, Rory, Vambow, Elton
- Previous meeting: Dec 2, 2020
- Announcements
- Action Items
- CPP and NPP Readiness Review
- Experiment Scheduling Calendar
- Procedures for Experiments
- Dec 3 CPP Design Meeting
- GlueX-II and DIRC ERR (Example)
- Elton briefly summarized the CPP Design meeting and preparations for the Readiness Review
- Beam test
- TOF trigger rate study with the upgraded TOF detector and optional lead shielding (Ilya)
- Beni: Hai has requested a Trigger Specification for discussions. He will work with Ilya to produce a document that can be provided to Hai
- Data Analysis (Andrew)
- Andrew asked some technical questions about analysis. David and Elton will send some examples for fitting.
- Other business
- Next meeting
- Dec 16. Rory: Use the time to Review status and preparations for the Readiness Review