Difference between revisions of "Π polarizability Meeting Dec 9, 2020"

From GlueXWiki
Jump to: navigation, search
(Minutes)
 
(2 intermediate revisions by the same user not shown)
Line 49: Line 49:
 
# Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]]
 
# Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]]
 
# Announcements
 
# Announcements
 +
# Action Items
 
# [[CPP and NPP Readiness Review]]
 
# [[CPP and NPP Readiness Review]]
 
#* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar]
 
#* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar]
 
#* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments]
 
#* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments]
 +
#* [[December 3, 2020 CPP Design Meeting |Dec 3 CPP Design Meeting]]
 
#*[[GlueX-II and DIRC ERR]] (Example)
 
#*[[GlueX-II and DIRC ERR]] (Example)
 
# Beam test
 
# Beam test
Line 60: Line 62:
  
 
== Minutes ==
 
== Minutes ==
'' Attending:
+
'' Attending: Beni, David, Ilya, Mark, Rory, Vambow, Elton
 +
 
 +
# Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]]
 +
# Announcements
 +
# Action Items
 +
# [[CPP and NPP Readiness Review]]
 +
#* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar]
 +
#* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments]
 +
#* [[December 3, 2020 CPP Design Meeting |Dec 3 CPP Design Meeting]]
 +
#*[[GlueX-II and DIRC ERR]] (Example)
 +
#* Elton briefly summarized the CPP Design meeting and preparations for the Readiness Review
 +
# Beam test
 +
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding] (Ilya)
 +
#* Beni: Hai has requested a Trigger Specification for discussions. He will work with Ilya to produce a document that can be provided to Hai
 +
# Data Analysis (Andrew)
 +
#* Andrew asked some technical questions about analysis. David and Elton will send some examples for fitting.
 +
# Other business
 +
# Next meeting
 +
#* Dec 16. Rory: Use the time to Review status and preparations for the Readiness Review

Latest revision as of 11:19, 9 December 2020

Meeting Info.

Meeting Time And Location

9:00 EST (JLab time)

REMOTE during Covid-19

Connecting

[Expand]

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

Action Items

  1. Output FCAL hits for muon generated events in MC (Andrew)
  2. Review TOF trigger requirements with Hai Dong (Beni and Ilya)

Agenda

  1. Previous meeting: Dec 2, 2020
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Beam test
  6. Data Analysis (Andrew)
  7. Other business
  8. Next meeting

Minutes

Attending: Beni, David, Ilya, Mark, Rory, Vambow, Elton

  1. Previous meeting: Dec 2, 2020
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Beam test
  6. Data Analysis (Andrew)
    • Andrew asked some technical questions about analysis. David and Elton will send some examples for fitting.
  7. Other business
  8. Next meeting
    • Dec 16. Rory: Use the time to Review status and preparations for the Readiness Review