Difference between revisions of "Nov 10, 2008 Calorimetry"
From GlueXWiki
(→Items for followup from Oct 27 meeting) |
(→Tentative Agenda) |
||
Line 37: | Line 37: | ||
# Bcal | # Bcal | ||
## [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout| Bcal readout]] | ## [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout| Bcal readout]] | ||
+ | ## Readout | ||
##* Review of use of APDs for readout? (Serguei) | ##* Review of use of APDs for readout? (Serguei) | ||
− | ## | + | ## Resolution studies |
− | + | ## Bcal Construction MOUs | |
− | ## Bcal Construction | + | |
##* [[Oct 15, 2008 Calorimetry | Visit to Alberta Oct 15]] | ##* [[Oct 15, 2008 Calorimetry | Visit to Alberta Oct 15]] | ||
=Minutes= | =Minutes= | ||
Attending: | Attending: |
Revision as of 14:42, 27 October 2008
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Oct 27 meeting
- Each subsystem must complete blanks in the Calibration Specification Table.
- Decision on Bcal sampling fraction needed if any changes are to be made to design.
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Up-to-date geometry ONGOING.
- Decreased threshold for FM pmts. ONGOING
- Position resolution - understand dependence on granularity.
- Different segmentation for the outer section. - LOWER PRIORITY
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
- Add roadmap for Bcal Roadmap to wiki (Elton)
Items for followup from Oct 27 meeting
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Updated schedule with new Fcal procurement dates. (Elke will send this to Matt)
- Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting).
- Updated drawings of Bcal modules (including O-ring) for discussions. Tim will see if that can be fitted into designer tasks.
Documents to Review
Tentative Agenda
- Announcements
- Calibration
- Progress on filling in the Calibration Specification Table.
- Fcal
- Report of timing studies with pmts and time calibration (Jake Bennet)
- Bcal
- Bcal readout
- Readout
- Review of use of APDs for readout? (Serguei)
- Resolution studies
- Bcal Construction MOUs
Minutes
Attending: