# Announcements | # Announcements | ||
#* Start of run is delayed to September 6 (Eugene/Alexandre) | #* Start of run is delayed to September 6 (Eugene/Alexandre) | ||
− | #* [https://mailman.jlab.org/pipermail/halld/2021-August/000905.html Access to the Lab] (Eugene) | + | #* [https://mailman.jlab.org/pipermail/halld/2021-August/000905.html Access to the Lab - new requirements] (Eugene) |
#* September Collaboration meeting 9/22 - 9/24 will be online: [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-GLUEX-SEP21 please register] | #* September Collaboration meeting 9/22 - 9/24 will be online: [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-GLUEX-SEP21 please register] | ||
# PrimEx run preparations (Sasha) | # PrimEx run preparations (Sasha) |
Revision as of 09:47, 26 August 2021
Contents
Meeting Coordinates
The meeting will be on Thursday, August 26, 2021 at 11:00 AM EST.
Connecting
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Start of run is delayed to September 6 (Eugene/Alexandre)
- Access to the Lab - new requirements (Eugene)
- September Collaboration meeting 9/22 - 9/24 will be online: please register
- PrimEx run preparations (Sasha)
- Hall and hot checkout status (Tim)
- Preparations for Shifts
- Required Reading for Remote Shifters
- remote shift connection demonstration planned for Thursday, Sept. 2 at 11A (Beni/Matt)
- local experts are encouraged to sign up for the gluex_shift_standby mailing list (Naomi)
- Update on CPP (Elton)
- Update on GlueX-II production, calibration, and monitoring (Igal)
- Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
- TAGH calibration, PS calibration, hardware maintenance, etc.
- Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
- maintenance of kinematic fitting framework
- Development of offsite data processing systems
- Maintenance of online monitoring tools (rootspy or full transition to hydra)
Additional brief reports from working groups as needed
- Software and Analysis
- Production and Analysis Working Group: August 25, 2021 (Alex)
- Offline Meeting: last meet August 17, 2021 (Mark)
- Particle ID Working Group: August 24, 2021 (Simon)
- Topical meetings
- Physics Working Group: August 17, 2021 (Sean)
- Amplitude Analysis Working Group: August 23, 2021 (Alex A.)
- Pseudoscalar-vector PWA: August 24, 2021 (Justin/Zisis)
- Cross-section Working Group: August 23, 2021 (Justin)
- Beam Asymmetry Working Group: August 16, 2020 (Zisis/Simon)
- PrimEx Working Group: August 20, 2021 (Sasha)
- Di-lepton/Rare Working Group: August 19, 2021 (Sean/Lubomir)
- JEF: August 20, 2021 (Simon/Liping/Sasha/Zisis)
- Hardware Working Groups:
- Engineering Activities: FCAL-II, CPP, other (Tim)
- last meeting was CPP Design Meeting, July 15
- Electronics and Firmware (Fernando)
- Beamline Status: August 17, 2021 (Richard)
- Tracking: August 19, 2021 (Naomi/Lubomir)
- DIRC: August 20, 2021 (Justin)
- Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
- Controls: August, 12
- Trigger (Sasha)
- Calorimetry: August 18, 2021 (Zisis/Mark)
- Start Counter: last meeting was August 5, 2021 (Mark I.)
- TOF: August 25, 2021 (Mark I.)
- Engineering Activities: FCAL-II, CPP, other (Tim)