Difference between revisions of "Run Planning Meeting Notes, October 14 - October 20, 2021"
From GlueXWiki
(→Friday, October 15) |
|||
Line 28: | Line 28: | ||
#* | #* | ||
#* 6h downtime - NL cold box + other things | #* 6h downtime - NL cold box + other things | ||
+ | #* harp scans - https://logbooks.jlab.org/entry/3924829 | ||
#* more rootspy nodes https://logbooks.jlab.org/entry/3924610 (David) | #* more rootspy nodes https://logbooks.jlab.org/entry/3924610 (David) | ||
# Remaining issues: | # Remaining issues: | ||
Line 33: | Line 34: | ||
#* Bleedthrough | #* Bleedthrough | ||
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
− | #* run till 5pm with full target, then with empty over the weekend | + | #* run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target |
Revision as of 07:35, 15 October 2021
Thursday, October 14
- In last 24 hours:
- FDC chiller tripped due to overheating - no chilled water flow: https://logbooks.jlab.org/entry/3923962
- Could not do rapid access - beacon bulb burned out - https://logbooks.jlab.org/entry/3924326 (lost about 40 min)
- Early riser summary: https://logbooks.jlab.org/entry/3924292
- Owl summary: https://logbooks.jlab.org/entry/3923921
- Swing summary: https://logbooks.jlab.org/entry/3923728
- Day summary: https://logbooks.jlab.org/entry/3923480
- ~400M triggers with B-field LHe 200nA + 300M without FDC
- short downtime (~30 min) HallA BLA calibration
- Run 81504 in raw mode
- Run 81505 ~40min no D laser, B,C up, A down, last minute with the D laser.
- PS background https://logbooks.jlab.org/entry/3923621 (Sasha)
- spike in beam current https://logbooks.jlab.org/entry/3923798
- Remaining issues:
- fixed the beacon and the FDC chiller
- noisy FDC wires https://logbooks.jlab.org/entry/3923747
- Bleedthrough
- Plan:
- 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.
Friday, October 15
- In last 24 hours:
- power of infiniband switch tripped (one strip cord)- causing 4h UED -https://logbooks.jlab.org/entry/3924903 https://logbooks.jlab.org/entry/3925176 https://logbooks.jlab.org/entry/3925185
- FDC chiller replaced https://logbooks.jlab.org/entry/3924510
- beacon bulb replaced - took 2h
- FDC hot wires https://logbooks.jlab.org/entry/3924538 - no more noise
- 6h downtime - NL cold box + other things
- harp scans - https://logbooks.jlab.org/entry/3924829
- more rootspy nodes https://logbooks.jlab.org/entry/3924610 (David)
- Remaining issues:
- fix remaining problems on gluon machines
- Bleedthrough
- Plan:
- run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target