Difference between revisions of "January 14, 2022 Tech group SAD meeting"
From GlueXWiki
(→Action Items) |
(→Action Items) |
||
Line 30: | Line 30: | ||
== Action Items == | == Action Items == | ||
− | * NMR controller | + | * NMR controller repair |
+ | * Set up PS leach meeting |
Revision as of 14:44, 14 January 2022
Meeting Time and Place =
Monday January 14, 2022 at 11:00 am Hall D Counting House Bluejeans https://bluejeans.com/465620466
Agenda
- Safety - New Covid guidance
- Hall D SAD Tasks
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move
- Platform mods
- Lead absorber
- Move Chambers to Hall next week for Beni/Elton to check HV on wires
- Solenoid Warm Up/Cool Down - 57K - lots of vacuum/pressure alarms - additional pumping
- Solenoid vacuum Turbo addition
- Goniometer Maintenance/Diamonds?
- PS Parasitic Detectors stages?
- DIRC Ressurection
- FCAL Insert Module fabrication
- Tagger NMR repair
- FDC chiller repair
- BCAL Coldshot Chiller commissioning
- Target Turbo repair
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation
- FCAL Insert Drawings
- General Maintenance
- On Call - Bobby
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- NMR controller repair
- Set up PS leach meeting