Difference between revisions of "Run Planning Meeting Notes, September 29 - October 5, 2022"
From GlueXWiki
m (→Issues) |
m (→Plan) |
||
Line 26: | Line 26: | ||
=== Plan === | === Plan === | ||
+ | *Once beam is back, re-do harp scans. | ||
*Continue taking production data on LHe at 200nA. | *Continue taking production data on LHe at 200nA. | ||
− | |||
=Thursday, September 29= | =Thursday, September 29= |
Revision as of 08:22, 30 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Friday, September 30
Past 24 hours
- Long maintenance day dedicated to RF recovery and injector setup in preparation for Hall A coming online
- Alex A. added back the standard physics monitoring histograms to the rootspy GUI [1]
- Shift summaries
Issues
Plan
- Once beam is back, re-do harp scans.
- Continue taking production data on LHe at 200nA.
Thursday, September 29
Past 24 hours
- Helium target was filled around 1:15PM yesterday.
- 2.5B triggers collected on helium target so far.
- Last run group: Empty Target PS triggers accounted for 33% of Empty+Full data set.
- Currently taking cosmics.
- Shift summaries
Issues
- 1.5hr downtime overnight from CPS breaker trip.
- FCAL Base lockup reset
Plan
- Maintenance Day
- Hall in controlled access.
- Walkthrough training at 10AM.
- When beam is back, we will continue taking production data on LHe at 200nA.