Difference between revisions of "Run Planning Meeting Notes, February 16 - February 22, 2023"
From GlueXWiki
(→Reports) |
(→Issues) |
||
Line 34: | Line 34: | ||
=== Issues === | === Issues === | ||
* [https://logbooks.jlab.org/entry/4132216 A bad voltage board in the BCAL. Needs to be changed.] (Mark) | * [https://logbooks.jlab.org/entry/4132216 A bad voltage board in the BCAL. Needs to be changed.] (Mark) | ||
+ | * [https://logbooks.jlab.org/entry/4132129 HallD Run #120726: LED ADC reference SiPM time anomaly] | ||
Pending: | Pending: | ||
* [https://logbooks.jlab.org/entry/4131558 TAGM discriminator TRG scaler gone wild] | * [https://logbooks.jlab.org/entry/4131558 TAGM discriminator TRG scaler gone wild] |
Revision as of 09:44, 16 February 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Thursday February 16
Past 24 hours
- Production runs with a stable beam.
- 2 BCAL HVs have been off since midnight due to a bad voltage board.
Shift Reports
Reports
- Rebooting NMR meter and its IOC (Hovanes)
- target LCW temperature alarm (Alexandre)
- Noise on some TPOL channels (Data should be good enough). (Michael Dugger, Beni)
- Statistics balance
- PARA 0/90: 20.9%
- PERP 0/90: 19.9%
- PARA 45/135: 20.8%
- PERP 45/135: 20.4%
- AMO : 18.1%
Issues
- A bad voltage board in the BCAL. Needs to be changed. (Mark)
- HallD Run #120726: LED ADC reference SiPM time anomaly
Pending:
- TAGM discriminator TRG scaler gone wild
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM.
Plans
- A bad BCAL HV board should be changed. Chris Stanislav is out today, and Mark D. is trying to find someone to change the BCAL board.
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)