Difference between revisions of "Run Planning Meeting Notes, February 16 - February 22, 2023"
From GlueXWiki
(→Issues) |
|||
Line 8: | Line 8: | ||
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count] | [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count] | ||
+ | |||
+ | = Friday February 17 = | ||
+ | |||
+ | === Past 24 hours === | ||
+ | * Mark D. replaced the bad BCAL HV board with a new one at XX:XX. | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4132353 0400-1000] | ||
+ | * [https://logbooks.jlab.org/entry/4132224 2200-0400] | ||
+ | * [https://logbooks.jlab.org/entry/4131994 1600-2200] | ||
+ | * [https://logbooks.jlab.org/entry/4131761 1000-1600] | ||
+ | * [https://logbooks.jlab.org/entry/4131531 0400-1000] | ||
+ | |||
+ | === Reports === | ||
+ | [https://logbooks.jlab.org/entry/4102104 Please don't prestart very early] (Naomi) | ||
+ | * Statistics balance | ||
+ | **PARA 0/90: 20.9% | ||
+ | **PERP 0/90: 19.9% | ||
+ | **PARA 45/135: 20.8% | ||
+ | **PERP 45/135: 20.4% | ||
+ | **AMO : 18.1% | ||
+ | |||
+ | === Issues === | ||
+ | * [https://logbooks.jlab.org/entry/4132216 A bad voltage board in the BCAL. Needs to be changed.] (Mark) | ||
+ | * [https://logbooks.jlab.org/entry/4132129 HallD Run #120726: LED ADC reference SiPM time anomaly] | ||
+ | Pending: | ||
+ | * [https://logbooks.jlab.org/entry/4131558 TAGM discriminator TRG scaler gone wild] | ||
+ | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking. | ||
+ | * BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?) | ||
+ | |||
+ | === Plans === | ||
+ | * Install CCAL whenever there is an extended accelerator downtime | ||
+ | ** Restricted Access is needed to be able to use the ramp <-done | ||
+ | ** Cabling | ||
+ | ** Survey is needed | ||
+ | * Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **2 runs PERP (0/90) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
+ | |||
= Thursday February 16 = | = Thursday February 16 = | ||
Revision as of 10:14, 16 February 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Friday February 17
Past 24 hours
- Mark D. replaced the bad BCAL HV board with a new one at XX:XX.
Shift Reports
Reports
Please don't prestart very early (Naomi)
- Statistics balance
- PARA 0/90: 20.9%
- PERP 0/90: 19.9%
- PARA 45/135: 20.8%
- PERP 45/135: 20.4%
- AMO : 18.1%
Issues
- A bad voltage board in the BCAL. Needs to be changed. (Mark)
- HallD Run #120726: LED ADC reference SiPM time anomaly
Pending:
- TAGM discriminator TRG scaler gone wild
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)
Plans
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Thursday February 16
Past 24 hours
- Production runs with a stable beam.
- 2 BCAL HVs have been off since midnight due to a bad voltage board.
Shift Reports
Reports
- Rebooting NMR meter and its IOC (Hovanes)
- target LCW temperature alarm (Alexandre)
- Noise on some TPOL channels (Data should be good enough). (Michael Dugger, Beni)
- Statistics balance
- PARA 0/90: 20.9%
- PERP 0/90: 19.9%
- PARA 45/135: 20.8%
- PERP 45/135: 20.4%
- AMO : 18.1%
Issues
- A bad voltage board in the BCAL. Needs to be changed. (Mark)
- HallD Run #120726: LED ADC reference SiPM time anomaly
Pending:
- TAGM discriminator TRG scaler gone wild
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM.
Plans
- A bad BCAL HV board should be changed. Chris Stanislav is out today, and Mark D. is trying to find someone to change the BCAL board.
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)