Difference between revisions of "Run Planning Meeting Notes, March 8 - March 15, 2023"
From GlueXWiki
Line 17: | Line 17: | ||
= Thursday March 9 = | = Thursday March 9 = | ||
===Past 24 hours=== | ===Past 24 hours=== | ||
− | Work on Injector(early day shift) | + | *Work on Injector(early day shift) |
+ | *HI test Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8 | ||
+ | *Production resumed at swing shift with AMO radiator configuration | ||
+ | *ABU=? hr | ||
=== Shift Reports === | === Shift Reports === |
Revision as of 19:30, 8 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Thursday March 9
Past 24 hours
*Work on Injector(early day shift) *HI test Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8 *Production resumed at swing shift with AMO radiator configuration *ABU=? hr
Shift Reports
- [ Early Riser Shift Summary]
- Day Shift Summary
- Swing Shift Summary
- [ Owl Shift Summary]
Reports
- High intensity test with Pb and Mo foils(Justin)
- [1] [2] Pb and Molybdenum foil inserted](Lubomir)
- [3] Doubled the thickness of the Molybdenum (Lubomir)
- [4] [5] CDC currents with W and W+Pb foils (Naomi)
- [6] CDC currents with W and Mo foils (Naomi)
- [7] AI on 16:25 3/8 swing (Naomi)
- [8] Beam halo alarms
Issues
Plans
- HI test continues with Pb and Mo foils[March 8 day shift], resume production after the HI test(~1 hr once 900 nA beam resumes).
- TAC run whenever opportunity comes( HallC are running at small current or down)
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)