Difference between revisions of "Run Planning Meeting Notes, March 8 - March 15, 2023"
From GlueXWiki
Line 10: | Line 10: | ||
[https://logbooks.jlab.org/book/hdlog Hall D Logbook] | [https://logbooks.jlab.org/book/hdlog Hall D Logbook] | ||
+ | |||
Line 43: | Line 44: | ||
*[https://logbooks.jlab.org/entry/4145367 Missing data on channel 23 TPOL](Roman) | *[https://logbooks.jlab.org/entry/4145367 Missing data on channel 23 TPOL](Roman) | ||
*[https://logbooks.jlab.org/entry/4145755 FCAL Base Lockup] [Rebecca,Jesse] | *[https://logbooks.jlab.org/entry/4145755 FCAL Base Lockup] [Rebecca,Jesse] | ||
+ | *[https://logbooks.jlab.org/entry/4145810 Beam Current over the night] [Jesse] | ||
=== Issues === | === Issues === | ||
*[https://logbooks.jlab.org/entry/4144945 TPOL alarms] | *[https://logbooks.jlab.org/entry/4144945 TPOL alarms] |
Revision as of 07:10, 9 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Thursday March 9
Past 24 hours
- Work on Injector(early day shift): completed, beam restored.
- HI test(900nA) Pb and Mo foils, HI study completed at the end of day shift and nominal production conditions restored including AC gain 10^-8
- Production resumed at swing shift with AMO radiator configuration
- Rate Scan study by Sasha: Swing shift, raw and production mode at different currents:300nA, 350nA and 400nA
- Production resumed with 0/90 PARA after Sasha's rate scan completion
- Beam off due to 1L09 tripping high voltage(~1.5hr)
- Beam (trippy) early owl shift, then better beam, then beam current was fluctuating and was under 300 nA
- ABU=5.48 hr(till 12 am)
Shift Reports
Reports
- High intensity test with Pb and Mo foils(Justin)
- [1] [2] Pb and Molybdenum foil inserted](Lubomir)
- Doubled the thickness of the Molybdenum (Lubomir)
- [3] [4] CDC currents with W and W+Pb foils (Naomi)
- CDC currents with W and Mo foils (Naomi)
- CDC AI on 16:25 3/8 swing (Naomi)
- Beam halo alarms
- Missing data on channel 23 TPOL(Roman)
- FCAL Base Lockup [Rebecca,Jesse]
- Beam Current over the night [Jesse]
Issues
Plans
- TAC run whenever opportunity comes( HallC run at small current or down)
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)