Difference between revisions of "January 17, 2023 Calorimeter"
From GlueXWiki
(Created page with "<font color=red>Meeting Day/Time: every 4th WEDNESDAY at 11:00 a.m. JLab time (monthly frequency during the long shutdown)</font>''<br> =Connection instructions= [https://hal...") |
(→Tentative Agenda) |
||
Line 39: | Line 39: | ||
## BCAL | ## BCAL | ||
# Calibration | # Calibration | ||
+ | ## 2022-08 [https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_phase_3_(2022-08)_BCAL_pi0_calibration BCAL done] & [https://halldweb.jlab.org/wiki/index.php/PrimEx-eta_phase3_FCAL_time/energy_calibrations FCAL done] | ||
+ | ## 2023-01 [https://halldweb.jlab.org/wiki/index.php/GlueX_phase_2_(2023-01)_BCAL_pi0_calibration BCAL done] & [https://halldweb.jlab.org/wiki/index.php/GlueX_phase_2,_2023-01_data_set FCAL timing & gains done] | ||
# Monitoring | # Monitoring | ||
# Reconstruction | # Reconstruction |
Revision as of 19:26, 16 January 2024
Meeting Day/Time: every 4th WEDNESDAY at 11:00 a.m. JLab time (monthly frequency during the long shutdown)
Contents
Connection instructions
References
- FCAL HDFCAL log book
- ECAL HDECAL log book
- BCAL HDBCAL log book
- CCAL HDCCAL log book
- Calibrations: 2020 Data Production; RunPeriod-2019-11 Validation; Offline Monitoring Data Validation
- Photon Reconstruction Task Force
- BCAL calibration links, 2020, PrimEx, SRC
Goals for Calorimetry Group
- Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
- Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at least 5 MeV.
- Demonstrate agreement of photon resolution between data and simulation as a function of E, phi and theta to within 5%.
- Demonstrate agreement of photon reconstruction efficiency between data and simulation as a function of E, phi and theta to within 5%.
Action Items
- Short term CALWG Items
- Long term items
- Calorimeter work packages
- AI - BCAL Monitoring:
Tentative Agenda
- Announcements
- Past Meeting Minutes
- Review Action Items
- Detectors
- FCAL/ECAL
- BCAL
- Calibration
- 2022-08 BCAL done & FCAL done
- 2023-01 BCAL done & FCAL timing & gains done
- Monitoring
- Reconstruction
- Simulations
- Any other business
Minutes
Attendees