Difference between revisions of "June 18, 2024 KLONG CPS Design Meeting"
From GlueXWiki
(Created page with "== Meeting Time and Place == Tuesday, June 04, 2024, 1:00pm Hall D Counting House * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim W...") |
|||
Line 1: | Line 1: | ||
== Meeting Time and Place == | == Meeting Time and Place == | ||
− | Tuesday, June | + | Tuesday, June 18, 2024, 1:00pm Hall D Counting House |
* Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard | * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard | ||
Line 6: | Line 6: | ||
== Agenda == | == Agenda == | ||
− | * Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/ | + | * Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_04,_2024_KLONG_CPS_Design_Meeting |
* Review new basic 3D model | * Review new basic 3D model | ||
** Core Section update | ** Core Section update | ||
** New radiation levels? Pavel | ** New radiation levels? Pavel | ||
+ | ** Copper replaced CuW inside and adjacent to magnet coils | ||
** Layout of magnet and components (Stephanie/Keith) | ** Layout of magnet and components (Stephanie/Keith) | ||
− | ** | + | ** Demo of AeroGo system successful |
− | *** | + | *** Noise low (less than 70 db in hall, 85db in ramp near compressor) |
− | *** | + | *** No visible dust |
− | + | ||
− | + | ||
− | + | ||
* Power supply status - On order, due March 2025 | * Power supply status - On order, due March 2025 | ||
+ | * Met with Survey and Alignment group and agreed on preliminary plan for alignment - will meet again as details develop | ||
* Magnet update (Josh/Stephanie) | * Magnet update (Josh/Stephanie) | ||
** Radiation levels at coils 2.E+4 Gy for a 10000 hour run | ** Radiation levels at coils 2.E+4 Gy for a 10000 hour run | ||
Line 23: | Line 22: | ||
* Copper cooling update - | * Copper cooling update - | ||
** Status of brazing sample test [[media:CPS Absorber cooling test sample.pdf]] | ** Status of brazing sample test [[media:CPS Absorber cooling test sample.pdf]] | ||
− | * Lead brick painting is | + | * Lead brick painting is 10% done and all due back in September |
* DeGauss test summer 2024 | * DeGauss test summer 2024 | ||
* June - items due from ERR | * June - items due from ERR | ||
− | ** Thermal cycling of tungsten and copper write up - in work - | + | ** Thermal cycling of tungsten and copper write up - in work - justifying annealed copper (Tim) |
+ | ** Working on ANSYS plastic analysis and FLUENT models | ||
== Minutes == | == Minutes == | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 12:17, 18 June 2024
Meeting Time and Place
Tuesday, June 18, 2024, 1:00pm Hall D Counting House
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard
Agenda
- Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/June_04,_2024_KLONG_CPS_Design_Meeting
- Review new basic 3D model
- Core Section update
- New radiation levels? Pavel
- Copper replaced CuW inside and adjacent to magnet coils
- Layout of magnet and components (Stephanie/Keith)
- Demo of AeroGo system successful
- Noise low (less than 70 db in hall, 85db in ramp near compressor)
- No visible dust
- Power supply status - On order, due March 2025
- Met with Survey and Alignment group and agreed on preliminary plan for alignment - will meet again as details develop
- Magnet update (Josh/Stephanie)
- Radiation levels at coils 2.E+4 Gy for a 10000 hour run
- Plan on using copper dump skid to cool magnet - is it adequate LCW?
- Copper cooling update -
- Status of brazing sample test media:CPS Absorber cooling test sample.pdf
- Lead brick painting is 10% done and all due back in September
- DeGauss test summer 2024
- June - items due from ERR
- Thermal cycling of tungsten and copper write up - in work - justifying annealed copper (Tim)
- Working on ANSYS plastic analysis and FLUENT models