* Solenoid status | * Solenoid status | ||
** PXI controller test with Windows (Brian) | ** PXI controller test with Windows (Brian) | ||
− | ** New PLC controller (Josh) | + | ** New PLC controller deployment (Josh) |
− | ** Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni) | + | ** Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes) |
* Power outage lessons | * Power outage lessons | ||
+ | ** PLC-s (Bobby) | ||
+ | ** EPICS (Hovanes) | ||
* PLC developments (Bobby, Josh) | * PLC developments (Bobby, Josh) | ||
*# ECAL chillers | *# ECAL chillers | ||
Line 16: | Line 18: | ||
* ECAL and FCAL voltage controls (Hovanes) | * ECAL and FCAL voltage controls (Hovanes) | ||
* Linux version for servers hosting EPICS IOC-s (Hovanes) | * Linux version for servers hosting EPICS IOC-s (Hovanes) | ||
+ | * New beam profiler | ||
* Other items | * Other items | ||
Revision as of 08:41, 25 June 2024
- Announcements
- Solenoid status
- PXI controller test with Windows (Brian)
- New PLC controller deployment (Josh)
- Alarm limits for solenoid PVs served by CA-server on PXI (Tim, Beni,Hovanes)
- Power outage lessons
- PLC-s (Bobby)
- EPICS (Hovanes)
- PLC developments (Bobby, Josh)
- ECAL chillers
- Chiller power
- Flow monitoring
- Dark room environment sensors
- Fan control and fan status monitoring
- ECAL HV crate resets and HV board interlocks
- EPICS screens & L5X file
- Archiving and alarms for PLC-based PVs
- ECAL chillers
- ECAL and FCAL voltage controls (Hovanes)
- Linux version for servers hosting EPICS IOC-s (Hovanes)
- New beam profiler
- Other items