Difference between revisions of "BLTWG Meeting 11/26/2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 17: Line 17:
 
#* plans for the 2025 run period - ''Richard''
 
#* plans for the 2025 run period - ''Richard''
 
# Any other business
 
# Any other business
#* Photon beam bleed-through from other halls: Most of the time it is not a big issue but every once in a while in may be. <br>An example of significant bleed-through is shown here during the CPP/NPP run period (2022-05) when Hall A was running at 5pass and 75uA. This bleed-through disappeared when HallA moved to 4pass.<br>
+
#* Photon beam bleed-through from other halls: Most of the time it is not a big issue but every once in a while in may be. <br>An example of significant bleed-through is shown here during the CPP/NPP run period (2022-05) when Hall A was running <br>at 5pass and 75uA. This bleed-through disappeared when HallA moved to 4pass.<br>
 
[[File:cppnpp_beforeANDafter_hallcPassChange.gif| 300px]]<br>
 
[[File:cppnpp_beforeANDafter_hallcPassChange.gif| 300px]]<br>
  
 
=== Notes ===
 
=== Notes ===

Revision as of 06:47, 26 November 2024

Organization

  • Time: 10:00 EDT
  • JLab meeting room: F324-325 in Cebaf Center
  • Connecting: detailed instructions are on GlueX Meeting Numbers

Agenda

  1. Announcements
  2. Calibration
    • progress to implement ML algorithm in halld_recon
  3. Development for future running past 2025
    • fraction of TAGM hits that survive as DBeamPhotons -- Richard
    • study of Mollers in the tagger for circular polarimetry -- Richard
    • need for improved FADC250 pulse finding algorithm for GlueX 3 -- Richard
  4. Current issues
    • spikes in the reconstruction efficiency at the ends of the microscope GitHub issue -- Richard
  5. Diamond radiators
    • plans for the 2025 run period - Richard
  6. Any other business
    • Photon beam bleed-through from other halls: Most of the time it is not a big issue but every once in a while in may be.
      An example of significant bleed-through is shown here during the CPP/NPP run period (2022-05) when Hall A was running
      at 5pass and 75uA. This bleed-through disappeared when HallA moved to 4pass.

Cppnpp beforeANDafter hallcPassChange.gif

Notes