Difference between revisions of "April 16, 2025"

From GlueXWiki
Jump to: navigation, search
(Meeting minutes)
(Meeting minutes)
 
Line 8: Line 8:
 
*Bhesha showed his current progress with the analysis note
 
*Bhesha showed his current progress with the analysis note
 
*Bo mentioned his updates on the background study of the pi minus p channel. Some more discussions with Bhesha on how to use the bggen information.
 
*Bo mentioned his updates on the background study of the pi minus p channel. Some more discussions with Bhesha on how to use the bggen information.
 +
*Oscar mentioned he is preparing for the qualification exam and asked about the background in GlueX detector

Latest revision as of 11:52, 16 April 2025

Connection details

Meeting minutes

  • Bhesha showed his current progress with the analysis note
  • Bo mentioned his updates on the background study of the pi minus p channel. Some more discussions with Bhesha on how to use the bggen information.
  • Oscar mentioned he is preparing for the qualification exam and asked about the background in GlueX detector