Difference between revisions of "Apr 30, 2009 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 26: | Line 26: | ||
## Preparations for construction | ## Preparations for construction | ||
## BCAL Readout | ## BCAL Readout | ||
+ | ##* Final report on First-article fibers (Zisis) | ||
+ | ##* Review of specifications for readout (Elton) | ||
# Agenda [[GlueX-Collaboration-May-2009]] | # Agenda [[GlueX-Collaboration-May-2009]] | ||
# Review of Action Items | # Review of Action Items | ||
=Minutes= | =Minutes= |
Revision as of 16:46, 29 April 2009
Teleconference Time: 11:00 a.m. EST
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting(s)
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Review options for import/export to Chile (loans, donations, transfers, etc.)
- Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.
Documents to Review
Tentative Agenda
- Announcements
- Calibration
- FCAL Update
- Simulations
- BCAL Update
- Preparations for construction
- BCAL Readout
- Final report on First-article fibers (Zisis)
- Review of specifications for readout (Elton)
- Agenda GlueX-Collaboration-May-2009
- Review of Action Items