Line 14: | Line 14: | ||
#* Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina) | #* Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina) | ||
# Review options for import/export to Chile (loans, donations, transfers, etc.) | # Review options for import/export to Chile (loans, donations, transfers, etc.) | ||
− | # Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance. | + | # <strike> Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance. </strike> |
= Documents to Review= | = Documents to Review= | ||
Line 44: | Line 44: | ||
=Minutes= | =Minutes= | ||
+ | |||
+ | # Announcements | ||
+ | # Calibration | ||
+ | # FCAL Update | ||
+ | # Simulations | ||
+ | # BCAL Fabrication | ||
+ | #* Preparations for construction | ||
+ | #* Final report on First-article fibers (Zisis) | ||
+ | # BCAL Readout | ||
+ | #* Update from USM (Will) | ||
+ | #* Update on SiPMs (electronics) | ||
+ | #* [[Media:BCAL readout1.pdf | Review of specifications for readout]] (Elton) | ||
+ | #* Electronic summing of sensors before digitization? (Elton) | ||
+ | # Agenda [[GlueX-Collaboration-May-2009]] Suggested list to be refined at next working group meeting | ||
+ | #* Fcal update | ||
+ | #* Timing resolution of FADCs | ||
+ | #* Bcal construction | ||
+ | #* Update on Bcal readout | ||
+ | #* Report on tests of first article fibers | ||
+ | # Review of Action Items |
Revision as of 14:50, 30 April 2009
Teleconference Time: 11:00 a.m. EST
- EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting(s)
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Review options for import/export to Chile (loans, donations, transfers, etc.)
-
Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.
Documents to Review
- GlueX-doc-795 Bcal Readout Specs
- GlueX-doc-1214 SiPM Cooling
Tentative Agenda
- Announcements
- Calibration
- FCAL Update
- Simulations
- BCAL Fabrication
- Preparations for construction
- Final report on First-article fibers (Zisis)
- BCAL Readout
- Update from USM (Will)
- Update on SiPMs (electronics)
- Review of specifications for readout (Elton)
- Electronic summing of sensors before digitization? (Elton)
- Agenda GlueX-Collaboration-May-2009 Suggested list to be refined at next working group meeting
- Fcal update
- Timing resolution of FADCs
- Bcal construction
- Update on Bcal readout
- Report on tests of first article fibers
- Review of Action Items
Minutes
- Announcements
- Calibration
- FCAL Update
- Simulations
- BCAL Fabrication
- Preparations for construction
- Final report on First-article fibers (Zisis)
- BCAL Readout
- Update from USM (Will)
- Update on SiPMs (electronics)
- Review of specifications for readout (Elton)
- Electronic summing of sensors before digitization? (Elton)
- Agenda GlueX-Collaboration-May-2009 Suggested list to be refined at next working group meeting
- Fcal update
- Timing resolution of FADCs
- Bcal construction
- Update on Bcal readout
- Report on tests of first article fibers
- Review of Action Items