Difference between revisions of "GlueX-2023-01 data reconstruction"

From GlueXWiki
Jump to: navigation, search
(Version)
(Version)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
[https://halldweb.jlab.org/wiki/index.php/Eta_Decay_Width_Measurements_via_Primakoff_Effect Back to the analysis page]
+
[https://halldweb.jlab.org/wiki-private/index.php/Production_and_Analysis_Working_Group Back to the main C&P page]
 
== Reconstruction launch overview==
 
== Reconstruction launch overview==
 
*Reconstruction of the physics objects from raw data using the danarest plugin
 
*Reconstruction of the physics objects from raw data using the danarest plugin
Line 24: Line 24:
 
** ver02: cost of rendering test - 24/12/2023. Finished on 26/12/2023.
 
** ver02: cost of rendering test - 24/12/2023. Finished on 26/12/2023.
 
** ver03: high-intensity studies - 09/01/2024. Finished on 23/01/2024.
 
** ver03: high-intensity studies - 09/01/2024. Finished on 23/01/2024.
** ver04/ver58: cooking - 10/05/2025. Finished on ??/??/2025.
+
** ver04/ver58: cooking - 05/10/2025. Finished on ??/??/2025.
  
 
* Summary:  
 
* Summary:  

Latest revision as of 11:18, 10 June 2025

Back to the main C&P page

Reconstruction launch overview

  • Reconstruction of the physics objects from raw data using the danarest plugin
  • Configuration of the launches:
    • /group/halld/data_monitoring/run_conditions/RunPeriod-2023-01
  • Input raw data (.evio):
    • /mss/halld/RunPeriod-2023-01/rawdata
  • Output reconstructed files (.hddm):
    • /mss/halld/RunPeriod-2023-01/recon

Version

  • Software stack:
  • Calibration time stamp:
    • ver01: circular/linear polarization proposal - variation=default calibtime=2023-12-07-00-00-01
    • ver02: cost of rendering per hour using NERSC's cpu test - variation=default calibtime=2023-12-07-00-00-01
    • ver03: high-intensity studies - variation=default calibtime=2024-01-09-12-00-01 and 2024-01-21-16-00-001
    • ver04/ver58: cooking - variation=default calibtime=2025-05-10-00-00-01 and 2025-05-10----00-001
  • Started on
    • ver01: circular/linear polarization proposal - 07/12/2023. Finished on 22/12/2023.
    • ver02: cost of rendering test - 24/12/2023. Finished on 26/12/2023.
    • ver03: high-intensity studies - 09/01/2024. Finished on 23/01/2024.
    • ver04/ver58: cooking - 05/10/2025. Finished on ??/??/2025.
  • Summary:
Runperiod Version Batch Min Run Max Run # Runs # REST Files (succeeded) Total Size of REST Files Site Priority Details
2023-01 01 01 120395 120438 30 5850 (5657) 28 TB NERSC* 1 [1]
2023-01 02 01 120437 120438 2 520 (500) 2.5 TB NERSC* 1 [2]
2023-01 03 02 120582 120602 11 856 (850) 4.1TB NERSC* 1 [3]
2023-01 04/58 01 120286 121207 526 97028 () XXTB NERSC* 1 [4][5]

(*) Acknowledgement: "This research used resources of the National Energy Research Scientific Computing Center (NERSC), a U.S. Department of Energy Office of Science User Facility operated under Contract No. DE-AC02-05CH11231."