Difference between revisions of "BLTWG Meeting 07/27/2009"
From GlueXWiki
m (BLTWG Meeting 07/13/2009 moved to BLTWG Meeting 07/27/2009: meet was postponed for two weeks) |
|||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
* Place: EVO and ESNET (with telephone bridge) | * Place: EVO and ESNET (with telephone bridge) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Tim, Ashot, Pawel, Eugene, Sasha, Victor, Dmitri, Sasha, Igor, Richard, Franz, Dan. |
===Agenda=== | ===Agenda=== | ||
# Simulations update + cave backgrounds - ''Sasha'' | # Simulations update + cave backgrounds - ''Sasha'' | ||
+ | # Draft report from the Tagger Magnet Review - ''Tim'' | ||
+ | # Work status reports - ''everyone'' | ||
+ | # Report on meeting with BNL diamond group - ''Richard'' | ||
+ | # Beamline work needed for Lehmann Review - ''Eugene'' | ||
+ | # Work plan in response to magnet review - discussion | ||
==Notes== | ==Notes== |
Latest revision as of 11:16, 27 July 2009
- Time: 11:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: Tim, Ashot, Pawel, Eugene, Sasha, Victor, Dmitri, Sasha, Igor, Richard, Franz, Dan.
Agenda
- Simulations update + cave backgrounds - Sasha
- Draft report from the Tagger Magnet Review - Tim
- Work status reports - everyone
- Report on meeting with BNL diamond group - Richard
- Beamline work needed for Lehmann Review - Eugene
- Work plan in response to magnet review - discussion