Difference between revisions of "Oct 22, 2009 Readout"
From GlueXWiki
(→Items for followup from previous meeting) |
|||
Line 36: | Line 36: | ||
= Minutes = | = Minutes = | ||
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | #* Alam sent an e-mail this morning to Zisis and Will indicating that payment has been made for the shipment of the Baby Bcal. Zisis will check on the shipment itself and send an e-mail confirmation. | ||
+ | # [[Detailed plan for testing production SiPM units | Plan for SiPM Testing]] (Carl and Fernando) | ||
+ | # [[Detailed plan for testing production SiPM units | Plan for SiPM Testing]] (Carl and Fernando) | ||
+ | # USM report | ||
+ | # Light Guide Geometry | ||
+ | # Light Guide Simulations | ||
+ | # Discussions on MOU with USM |
Revision as of 14:27, 22 October 2009
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
-
Ship Baby Bcal to USM. -
Alam (Pedro) to post files for new geometry of light guides.
Documents to Review
- Media:Draw trigs 38deg.pdf Media:Draw trigs 73deg.pdf for segment #2.
- Entrance rectangle is 3.01x4.0 cm. Exit radius is 1.35 cm. Length of trapezoid/cone is 60 cm, and length of torus is also 60 cm.
- This configuration should be comparable to Alam's "cylindrical cone" geometry.
- See also Effective diameter vs B field and angle from Antonelli et al., NIMA 368 (1996) 628-634.
- Magnetic field plots
- Light guide prototypes. See Quote from Plastic Craft and Ray tracing through light guides
Tentative Agenda
- Announcements
- Review of Action Items
- Plan for SiPM Testing (Carl and Fernando)
- USM report
- Light Guide Geometry
- Light Guide Simulations
- Discussions on MOU with USM
Minutes
- Announcements
- Review of Action Items
- Alam sent an e-mail this morning to Zisis and Will indicating that payment has been made for the shipment of the Baby Bcal. Zisis will check on the shipment itself and send an e-mail confirmation.
- Plan for SiPM Testing (Carl and Fernando)
- Plan for SiPM Testing (Carl and Fernando)
- USM report
- Light Guide Geometry
- Light Guide Simulations
- Discussions on MOU with USM