Difference between revisions of "Minutes-4-22-2010"
From GlueXWiki
Line 5: | Line 5: | ||
# Production | # Production | ||
− | #* UVA wire stringing equipment (Brian) [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail.jpg pin rail], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasCam.jpg pos meas cam], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeas.jpg pos meas ], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasParts.jpg pos meas parts], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PretensionScrews.jpg pretension screw], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/StringTable3.jpg string table] | + | #* UVA wire stringing equipment (Brian): [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail.jpg pin rail], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasCam.jpg pos meas cam], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeas.jpg pos meas ], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasParts.jpg pos meas parts], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PretensionScrews.jpg pretension screw], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/StringTable3.jpg string table] |
#* off-site production space planning | #* off-site production space planning | ||
# Updates on: | # Updates on: | ||
#* Electronics: PCB, cable procurement status (Fernando) | #* Electronics: PCB, cable procurement status (Fernando) | ||
#* Cathode redesign (Bill, Roger) | #* Cathode redesign (Bill, Roger) | ||
− | #* FDC | + | #* FDC [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling](Bill) |
# Full scale prototype | # Full scale prototype | ||
#* status (Lubomir) | #* status (Lubomir) |
Revision as of 20:20, 21 April 2010
April 15, 2010 FDC meeting
Tentative Agenda
- Production
- UVA wire stringing equipment (Brian): pin rail2, pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- off-site production space planning
- Updates on:
- Electronics: PCB, cable procurement status (Fernando)
- Cathode redesign (Bill, Roger)
- FDC cabling(Bill)
- Full scale prototype
- status (Lubomir)
- grounding problems (Fernando)
- cosmics tests (Beni)
- Other