Difference between revisions of "Minutes-6-10-2010"
From GlueXWiki
Line 7: | Line 7: | ||
#* [http://www.jlab.org/Hall-D/detector/fdc/procedures/production_plan.docx production planning ] | #* [http://www.jlab.org/Hall-D/detector/fdc/procedures/production_plan.docx production planning ] | ||
#* wire stringing | #* wire stringing | ||
− | #* tension | + | #* tension measurement system |
# Electronics | # Electronics | ||
#* fADC125 status (Gerard, Fernando) | #* fADC125 status (Gerard, Fernando) |
Revision as of 15:54, 9 June 2010
June 10, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- wire stringing
- tension measurement system
- Electronics
- fADC125 status (Gerard, Fernando)
- noise/grounding investigations (Fernando)
- Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
- Full-scale prototype tests
- cosmics tests FDC Log Book, page 468 (Beni)
- new tests with fADC125 (Lubomir)
- Other