Difference between revisions of "Coil Test Weekly Meeting 11-Nov-2010"
From GlueXWiki
m |
m |
||
Line 32: | Line 32: | ||
** more redundancy? | ** more redundancy? | ||
** interlock checkout | ** interlock checkout | ||
− | ** ODH on platform | + | ** ODH rating on platform and training |
** broken/flaky sensors/gauges/instruments | ** broken/flaky sensors/gauges/instruments | ||
*** replace Pt sensor in heat exchanger with Si diode? | *** replace Pt sensor in heat exchanger with Si diode? | ||
*** C-glass calibrations | *** C-glass calibrations | ||
*** flat-lined Pt sensors | *** flat-lined Pt sensors | ||
− | ** vacuum valve interlock | + | ** vacuum gate valve interlock |
** what to do about strain gauges? | ** what to do about strain gauges? | ||
+ | ** what spares should we order? | ||
+ | *** liquid level monitor/probes | ||
+ | *** vacuum monitor/gauges | ||
+ | *** what else? | ||
+ | ** complete PLC programming | ||
+ | ** complete HMI programming | ||
+ | ** complete EWEB programming | ||
* Rdesktop/VNC policy and procedures - Yi, Josh | * Rdesktop/VNC policy and procedures - Yi, Josh | ||
Line 56: | Line 63: | ||
* PLC operations - Mark W | * PLC operations - Mark W | ||
− | ** PID tuning, calibration, JT valve limits, etc. | + | ** PID tuning, calibration, JT valve limits, other limits, etc. |
** rework PID loop strategy | ** rework PID loop strategy | ||
** magnet ramp down mechanism | ** magnet ramp down mechanism | ||
− | ** UPS interlock | + | ** UPS interlock status |
+ | ** alarm strategy | ||
** can PLC log info to file? | ** can PLC log info to file? | ||
+ | ** improve early problem detection | ||
** another tutorial | ** another tutorial | ||
Line 69: | Line 78: | ||
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | * HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | ||
** program access to archived data | ** program access to archived data | ||
+ | ** alarm screens | ||
** another tutorial | ** another tutorial | ||
+ | |||
+ | * Labview/fast DAQ - Yi, Elliott | ||
+ | ** computer | ||
+ | ** hardware | ||
+ | ** programming | ||
+ | *** coordinate time, state with PLC | ||
+ | ** displays | ||
+ | ** archive | ||
* Elog experience - All | * Elog experience - All |
Revision as of 10:51, 9 November 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 4-Nov-2010 9:30 am ARC 428
Agenda
- Long term personnel outlook - Elliott
- tranfer of PLC programming responsibility
- Experience with control system - All
- what have we learned, and is it written down?
- what will we do differently for the next coil?
- what needs to be added/modified/improved?
- EWEB strip charts
- add missing sensors to EWEB pages
- add PID info
- Preparation for powered operations - Elliott
- OSP, checklists, etc.
- shunt installation/wiring, connection to interlock/control system
- ground fault detection
- fast DAQ, which channels, what rates, how to coordinate time with PLC archive?
- rewire quench detector, how to balance channels?
- revisit fast/slow dump strategies - avoid fast dumps at all costs
- Hall probe
- pickup coils
- 240 V UPS on Danfysik control boards, main breaker
- more redundancy?
- interlock checkout
- ODH rating on platform and training
- broken/flaky sensors/gauges/instruments
- replace Pt sensor in heat exchanger with Si diode?
- C-glass calibrations
- flat-lined Pt sensors
- vacuum gate valve interlock
- what to do about strain gauges?
- what spares should we order?
- liquid level monitor/probes
- vacuum monitor/gauges
- what else?
- complete PLC programming
- complete HMI programming
- complete EWEB programming
- Rdesktop/VNC policy and procedures - Yi, Josh
- PI Responsibilities during test - Jonathan
- Low power magnet testing 5A, 50A,100A - Elliott
- High power magnet testing 100-1500A - Elliott
- Identify possible turn to turn shorts during ramping - Eugene
- Assess Heim column centering in coil - George
- Assess Axial column forces - George
- Estimate LN2 and He heat leak - Jonathan
- Assess LN2 and LHe thermal siphons - Jonathan
- Controls racks - Scot
- strain gauge and UPS interlocks
- UPS lifetime test
- PLC operations - Mark W
- PID tuning, calibration, JT valve limits, other limits, etc.
- rework PID loop strategy
- magnet ramp down mechanism
- UPS interlock status
- alarm strategy
- can PLC log info to file?
- improve early problem detection
- another tutorial
- EPICS - Hovanes
- connection to guard shack and notification conditions
- pager status and strategy
- HMI and EWEB programming - Yi, Hovanes
- program access to archived data
- alarm screens
- another tutorial
- Labview/fast DAQ - Yi, Elliott
- computer
- hardware
- programming
- coordinate time, state with PLC
- displays
- archive
- Elog experience - All
- remember to enter your name!
- do we need automatic entries?
- Coil repair status - George
- loose CF (ConFlat) flanges
- Learn how to use Linux for web and email - Elliott
- Solenoid review 7-Dec
- Purchase of another PLC and Ethernet module - Elliott
- Hall D Technical web page
- Preparations for testing next coil - George, Scot, Elliott
- update P&I
- splices
- yoke location
- piping adaptors
- downstream yoke spacers
- controls racks rewiring
- quench detector connections
- connectors on next coil
- fix known problems
- what else?