− | Participants: | + | Participants: Dave, Chris, Eugene, Roger, Simon, Beni, Mark, and Lubomir. |
== Production == | == Production == | ||
− | - Dave: | + | - Dave: The first exercise on making cathode foils was successful; for that we used two damaged panels, but made one extra cut on one of them. To exercise the cathode tensioning we need to glue the third panel but we can use just a Kapton piece. Temporary lights have been installed in the "dirty" area. The stringing table soon will be ready and will be moved inside the clean room. The granite plate ("monument") in 126 that was used for flatness measurements will be moved to the clean room, as well. |
− | - The | + | - The clean tend at 126 was dismounted and the parts will be moved away by the end of the week. To plan the space in 126 one can use the pdf drawing linked above. |
+ | |||
+ | - For the readiness review both, a wiki page (linked above) and a website | ||
== Electronics == | == Electronics == |
Revision as of 15:49, 17 March 2011
March 17, 2011 FDC meeting
Agenda
- Production
- Production status (David)
- Readiness Review (Lubomir, Dave)
- Electronics (Fernando,Chris)
- fADC125
- Other
- Engineering (David)
- Conductive tape soldering
- Other
- Chamber testing
- "Upside-down" tests (Lubomir)
- Testing set-up improvements (Beni)
- Other