Difference between revisions of "Minutes-11-10-2011"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
# Engineering update (Bill)   
 
# Engineering update (Bill)   
 
# Electronics update (Chris)
 
# Electronics update (Chris)
 +
# Test set-up at EEL126 (Beni)
 
# [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Lubomir)  
 
# [http://www.jlab.org/Hall-D/detector/fdc/tdr/tdr.pdf TDR] (Lubomir)  
 
# Other
 
# Other

Revision as of 12:52, 10 November 2011

November 10, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production update
    • Second package tests (Lubomir)
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Test set-up at EEL126 (Beni)
  5. TDR (Lubomir)
  6. Other