Difference between revisions of "GlueX TOF Meeting, May 10, 2012"
(→Minutes) |
(→Minutes) |
||
Line 36: | Line 36: | ||
* '''FSU''': Paul Eugenio, Kurt Koetz, Sasha Ostrovidov, Randall Smith | * '''FSU''': Paul Eugenio, Kurt Koetz, Sasha Ostrovidov, Randall Smith | ||
* '''JLab''': Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann | * '''JLab''': Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann | ||
+ | |||
+ | ==Contract== | ||
+ | |||
+ | The proposal from FSU on the constuction constract has been through technical review and a report filed with JLab Procurement. The committee members were Beni, Dan Carman, Elton, Bruce Lenzer, and Mark. Eugene Chudakov was present at the review meeting. Mark has been, and will continue to, check on progress at Procurement. | ||
+ | |||
+ | ==PMT Purchase== | ||
calibration and alignment | calibration and alignment |
Revision as of 14:28, 12 May 2012
Thursday, May 10, 2012
10:00 am EDT
JLab: CEBAF Center, F326/327
Contents
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- GlueX Collaboration Meeting Agenda
- Mechanical design: Tim, Chuck
- Prototype status: Paul, Sasha
- TDC choice: all
- Contract Status: Mark, Paul
- Calibration and Alignment
- Technical Design Report contribution
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
Chairman's Cell Phone
(757)504-0664
Minutes
Present:
- FSU: Paul Eugenio, Kurt Koetz, Sasha Ostrovidov, Randall Smith
- JLab: Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann
Contract
The proposal from FSU on the constuction constract has been through technical review and a report filed with JLab Procurement. The committee members were Beni, Dan Carman, Elton, Bruce Lenzer, and Mark. Eugene Chudakov was present at the review meeting. Mark has been, and will continue to, check on progress at Procurement.
PMT Purchase
calibration and alignment sasha going through materails, research sub committee
technical design report, updating in progress by Paul
no tests on the new light guides
independent support of curved metal that supports soft steel
cross bars on the end
prototype will be machined at FSU materials will be boutht by jlab
drawings will be shipped to FSU