Line 15: | Line 15: | ||
= Minutes = | = Minutes = | ||
− | Participants: Dave, Chris, Nick, Simon, Beni | + | Participants: Bill, Dave, Chris, Nick, Mark, Simon, Beni, and Lubomir. |
== Production == | == Production == | ||
− | - Dave for package #4 production: | + | - Dave for package #4 production: on wire frame #27 tension measurements were done, #28 will go on the stringing table next (the last for the package). #26 and #27 will be deadened on Monday. #26 has components, Chris will put components on #27 Monday/Tuesday. Working now on all the remaining cathodes for the package. |
- Today we continued with the installation of the last two cells of the third package. Before the installation, in one of the new wire planes we found one broken wire (between the pad and the epoxy) that was fixed on Tuesday and checked on Wednesday. After the meeting all the cells of package #3 were installed and started flushing with gas. | - Today we continued with the installation of the last two cells of the third package. Before the installation, in one of the new wire planes we found one broken wire (between the pad and the epoxy) that was fixed on Tuesday and checked on Wednesday. After the meeting all the cells of package #3 were installed and started flushing with gas. |
Revision as of 17:31, 17 May 2012
May 17, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production status
- Third package tests (Lubomir)
- Engineering update
- Electronics update (Chris)
- Grounding
- Tests with first package in 126 FDC E-log (Beni)
- Other