− | - Dave for package #4 production: on wire frame #27 tension measurements were done, #28 will go on the stringing table next | + | - Dave for package #4 production: on wire frame #27 tension measurements were done, #28 will go on the stringing table next. The last wire frame for the package will go on the table by the end of the next week. #26 and #27 will be deadened on Monday. #26 has components, Chris will put components on #27 Monday/Tuesday. Working now on all the remaining cathodes for the package. Expect to have all the cathode for the package ready in two weeks. Bill asked Dave to put the wire frame numbers on the samples for the wire deadening. |
− | - | + | - Third package was fully assembled a week ago and as of today the oxygen is 140ppm and it still may go a little down. For comparison we had 75ppm for one cell and 111ppm for four cells. Roughly we have ~10ppm contribution from each cell plus ~65ppm from the gas and gas system. In any case the oxygen is very low. All the cells were tested and all the channels are fine, except we had HV problem on the top cell: there was short (~1MOhm) to ground from two positive HV sectors. It turned out one shorts ONLY to the ground on the top cathode, and the other HV sector shorts ONLY to a particular strip on the top cathode. No connectivity was found to anything else, like wire frame ground, field wires etc. After the meeting we opened the package and as Dave predicted, we found two sense wires not completely cut, sticking up and making contact with the top cathode. The problem was fixed and we closed the package. Now we will have to wait one more week to get the oxygen down and do final tests. |
− | + | ||
− | + | ||
== Engineering == | == Engineering == | ||
− | + | ||
== Electronics == | == Electronics == |
Revision as of 17:53, 17 May 2012
May 17, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production status
- Third package tests (Lubomir)
- Engineering update
- Electronics update (Chris)
- Grounding
- Tests with first package in 126 FDC E-log (Beni)