Difference between revisions of "Minutes-5-10-2012"

From GlueXWiki
Jump to: navigation, search
Line 32: Line 32:
 
== Electronics ==
 
== Electronics ==
  
- Chris: Jim and Chuck made the drawings of the grounding clip. It will be Cu-Be 13mill thick and will have a force of 7.5lb (Bill: in this case we have to use Rohacell between the wire frame and the cathode. One company only responded to the bid: $2k for 500 clips (need ~120 per package). Chris submitted a PR.  
+
- Chris: Jim and Chuck made the drawings of the grounding clip. It will be Cu-Be 13mill thick and will have a force of 7.5lb; Bill: in this case we have to use Rohacell between the wire frame and the cathode. One company only responded to the bid: $2k for 500 clips (need ~120 per package). Chris submitted a PR.  
  
 
- After some discussions we figured out that we can easily extend the grounding to the cathode from the top cell. We just extend the Cu foil to that cathode and put the clips that we have now on the top of the copper foil, thus we will also prevent damaging the cathode foil. In this case we may not need to do the inter-cell ground connections.  
 
- After some discussions we figured out that we can easily extend the grounding to the cathode from the top cell. We just extend the Cu foil to that cathode and put the clips that we have now on the top of the copper foil, thus we will also prevent damaging the cathode foil. In this case we may not need to do the inter-cell ground connections.  
Line 40: Line 40:
 
== Tests with first package at 126 ==
 
== Tests with first package at 126 ==
  
- Beni: HV now is 1600V to avoid afterpulsing, the efficiency is ~90% except two cells with areas below 80%. The position resolution is still of the order of 300 microns. Beni explained the procedure he uses to estimate the resolution: the incident angle from the external tracking and then comparing the positions from parallel wires the pairs of cells that have wires with the same direction. We discussed different sources that could make the resolution worse: how parallel the wires on the different cells are, the time to distance conversion in presence of oxygen and low efficiency for big drift times. Also Beni wants to look in the external chambers showing some uneven distributions of the cosmics.
+
- Beni: working on the wire resolution. So far it is much worse than it was in the prototype, about ~400 microns. Beni traced down the problem to the very bad timing resolution of ~14ns. It was estimated using a simplified scheme: separating only vertical (from the Indiana chambers) tracks and comparing the timings from the parallel wires in the first and fourth packages. Most likely to problem is due to the oxygen in the gas, but Beni wants to check the F1TDC using different mode. Also it could be a result of a poor angular resolution of the Indiana chambers, but to see its effect it must be worse than 5mrad. Beni will report on this in the Collaboration meeting.
 +
 
 +
== Other ==
 +
 
 +
- Vladimir is arriving on May 30 for six months, will be helping with the package tests.
 +
 
 +
- Due to the Collaboration meeting Monday-Wednesday next week, unless there's something urgent, we will not have FDC meeting next week.    
  
 
-->
 
-->

Revision as of 18:38, 17 May 2012

May 17, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production status
    • Third package tests (Lubomir)
  2. Engineering update
  3. Electronics update (Chris)
    • Grounding
  4. Tests with first package in 126 FDC E-log (Beni)
  5. Other