Difference between revisions of "Aug 9, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
Line 23: Line 23:
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:
 +
 +
== Tentative Agenda ==
 +
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# SiPM production testing (everyone)
 +
#* SiPMs assignment for new boards
 +
# Mechanical assembly (Jim)
 +
# Temperature compensation (Jack)
 +
# Electronic boards (Chris)
 +
# Light guide gluing setup (Scot via e-mail)
 +
#* I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today.
 +
#* I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682

Revision as of 17:55, 9 August 2012

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
    • This specifically includes the settings for the pre-production boards that are needed by Wed of next week.
  2. Test wrapping forms (Elton)
  3. Order glue (and any other consumables) to glue light guides (Scot)
  4. Check new gluing jig for the light guides (Scot and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)
    • I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today.
    • I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682

Minutes

Attending:

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)
    • I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today.
    • I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682