Difference between revisions of "Aug 16, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 5: | Line 5: | ||
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\ | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\ | ||
# Review requirement of 2.5 reduced gain reduction (Elton) | # Review requirement of 2.5 reduced gain reduction (Elton) | ||
+ | #* See [https://cebaf.jlab.org/elog/entry/1787299 Log Entry with plots] | ||
+ | #* See [https://mailman.jlab.org/pipermail/halld-cal/2012-May/000588.html e-mail with comments] | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 12:21, 16 August 2012
Action Items from previous meetings
- Test wrapping forms (Elton)
- Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris)
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
- Review requirement of 2.5 reduced gain reduction (Elton)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup (Scot via e-mail)
Minutes
Attending: