Difference between revisions of "Aug 30, 2011 SiPM Electrical and Cooling"
From GlueXWiki
Line 19: | Line 19: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: Elton, Ivan, Scot, Chris, Jim, Jack, Yi |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule, reporting, and manpower (Elton) | ||
+ | # mini-Bcal (Elton) | ||
+ | # SiPM production testing (Yi) | ||
+ | # Mechanical assembly (Jim) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Electronic boards (Fernando and Chris) | ||
+ | # Light guide gluing setup (Scot) |
Revision as of 17:16, 30 August 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
-
Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack) -
Sort out missing SiPMs in Jack's list (10 sensors) (Jack and Yi)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: Elton, Ivan, Scot, Chris, Jim, Jack, Yi
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)