Difference between revisions of "Controls Meeting 6-Sep-2012"
From GlueXWiki
m |
m |
||
Line 16: | Line 16: | ||
* Solenoid test - Mark, Josh, Scot, Elliott | * Solenoid test - Mark, Josh, Scot, Elliott | ||
** Revised Cooldown Date | ** Revised Cooldown Date | ||
− | ** Required documenation | + | ** Required documenation includes entries into JInventory database! |
** Fasttrack schedule | ** Fasttrack schedule | ||
** Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews | ** Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews |
Revision as of 10:48, 5 September 2012
Agenda
Note: we will move quickly through the status reports to give Beni plenty of time
- Announcements
- Daniel will talk about the FCAL base control system and firmware at the 20-Sep meeting
- Ed Jastrzembski will give a followup talk about FPGA programming in Oct
- Minutes from previous meeting 23-Aug-2012
- Hardware purchase status - Josh, Hovanes
- Test Stand - Josh
- SOE, Turbo pump
- EPICS - Hovanes
- Counting house installation - Hovanes
- JInventory improvements - Elliott
- purchase barcode labels now?
- Solenoid test - Mark, Josh, Scot, Elliott
- Revised Cooldown Date
- Required documenation includes entries into JInventory database!
- Fasttrack schedule
- Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews
- Test plan, procedures, THA
- Vacuum, SOE, quench detector, etc.
- PLC programming and PXI system - Josh, Dave, Yi
- Gas System - Beni plot
- Mantis task tracker
- Midas elog
- Experiment Control Supervisor - Elliott
- Accelerator Elog - Elliott
Time/Location
9:30AM Thurs 6-Sep-2012 CC L207
Announcements
Next Meeting
9:30am Thurs 20-Sep-2012 CC L207