# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | ||
− | # Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack) | + | # <strike> Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack) </strike> |
− | # Provide feedback to Fernando on his readout assembly schedule (Elton and Jim) | + | # <strike> Provide feedback to Fernando on his readout assembly schedule (Elton and Jim) </strike> |
# Check uniformity of LED source in black testing box | # Check uniformity of LED source in black testing box | ||
− | # Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) | + | # Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) In progress |
− | # Send P6 line numbers (and accounts) to Jim for purchase of the mechanical parts (Elton). | + | # <strike> Send P6 line numbers (and accounts) to Jim for purchase of the mechanical parts (Elton). </strike> |
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 16:07, 18 October 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
-
Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack) -
Provide feedback to Fernando on his readout assembly schedule (Elton and Jim) - Check uniformity of LED source in black testing box
- Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) In progress
-
Send P6 line numbers (and accounts) to Jim for purchase of the mechanical parts (Elton).
Tentative Agenda
- Announcements
- Action Items
- Schedule for production and testing (all)
- Schedule for production (Fernando and Jim)
- Schedule for SiPM assignment and jumper sheets
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- U-board puller?
- Light guide gluing setup (Scot)
Minutes
Attending: