Difference between revisions of "Nov 1, 2011 SiPM Electrical and Cooling"
From GlueXWiki
Line 2: | Line 2: | ||
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | ||
− | # Check uniformity of LED source in black testing box | + | # <strike> Check uniformity of LED source in black testing box </strike> |
# Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) | # Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) | ||
− | # Produce jumper settings for first article boards next week (Jack) | + | # <strike> Produce jumper settings for first article boards next week (Jack) </strike> |
# Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi) | # Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi) | ||
Line 23: | Line 23: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: Chris, Nick, Yi, Ivan, Jim, Elton |
+ | |||
+ | # Announcements | ||
+ | # Action Items | ||
+ | # Schedule for production and testing (all) | ||
+ | #* Schedule for production (Fernando and Jim) | ||
+ | #* Schedule for SiPM assignment and jumper sheets | ||
+ | # mini-Bcal (Elton) | ||
+ | # SiPM production testing (Yi) | ||
+ | # Mechanical assembly (Jim) | ||
+ | # Temperature compensation (Jack) | ||
+ | # Electronic boards (Fernando and Chris) | ||
+ | #* U-board puller? | ||
+ | # Light guide gluing setup (Scot) |
Revision as of 15:44, 1 November 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
-
Check uniformity of LED source in black testing box - Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim)
-
Produce jumper settings for first article boards next week (Jack) - Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi)
Tentative Agenda
- Announcements
- Action Items
- Schedule for production and testing (all)
- Schedule for production (Fernando and Jim)
- Schedule for SiPM assignment and jumper sheets
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- U-board puller?
- Light guide gluing setup (Scot)
Minutes
Attending: Chris, Nick, Yi, Ivan, Jim, Elton
- Announcements
- Action Items
- Schedule for production and testing (all)
- Schedule for production (Fernando and Jim)
- Schedule for SiPM assignment and jumper sheets
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- U-board puller?
- Light guide gluing setup (Scot)