(Created page with "November 29, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_29_2012.xlsx Construction Tracking] (Dave) #*...") |
|||
Line 18: | Line 18: | ||
= Minutes = | = Minutes = | ||
− | Participants: Eugene | + | Participants: Eugene, Dave, Chris, Nick, Vlad, Simon, Beni, Glenn, and Lubomir. |
== Production == | == Production == | ||
− | - | + | - Dave: now working on package #2. |
+ | |||
+ | - On package #1 Vlad installed the ground connection before | ||
- Vlad finished testing package #1. All channels are working fine. Three pre-amps are oscillating, but the channels are working if using other cards at the same places. Two of the cards have been replaced already with new ones, still the same problem. After ground installation we hope the problem will disappear, if not we can replace the cards later. | - Vlad finished testing package #1. All channels are working fine. Three pre-amps are oscillating, but the channels are working if using other cards at the same places. Two of the cards have been replaced already with new ones, still the same problem. After ground installation we hope the problem will disappear, if not we can replace the cards later. |
Revision as of 16:05, 29 November 2012
November 29, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #1 subsystems
- Package #2 production
- Package #4 testing (Vlad)
- Corrosion tests (Vlad)
- Engineering
- Electronics (Chris, Nick)
- Tests at EEL126 (Lubomir)
- Third package wire resolution FDC E-log
- Plans for testing packages #1 and #4
- Other