Difference between revisions of "Microscope Fabrication Readiness Review"
From GlueXWiki
(→Contract Related Documents) |
(→Contract Related Documents) |
||
Line 75: | Line 75: | ||
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_UConn/Milestones-Active-Collimator.pdf Milestones for the Active Collimator] | [https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_UConn/Milestones-Active-Collimator.pdf Milestones for the Active Collimator] | ||
+ | |||
+ | [https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_UConn/review_report_uconn.docx Technical Review Report] |
Revision as of 15:28, 28 January 2013
Contents
Date and Time
February 7, 2013
Video Connection information if needed
- ESNET and EVO session
- Phone only if requested:
- +1-866-740-1260 : US
- access code: 3421244# (remember the "#"). Phone line by request only.
Participants
UConn
- Richard Jones (Professor of Physics)
- James McIntyre (graduate student)
- Alex Barnes (undergraduate student)
JLab
- Fernando Barbosa (Hall D eletrical engineer)
- Eugene Chudakov (Hall D group leader) [not confirmed]
- Hovanes Egiyan (Hall D Staff)
- Bruce Lenzer (JLab ESH&Q)
- Elton Smith (Hall D Staff)
- Alexander Somov (Hall D Staff, SOTR)
- Timothy Whitlatch (Hall D engineer)
- Igor Senderovich (ASU postdoc, formerly in UConn group)
- Jarrod Fitzpatrick (CFO)
Topics/Issues that need discussion/resolution
Documents on the Microscope Construction
- Drawings (wiki) Short list of updated drawings:
- Electronics (wiki)
- Microscope construction (wiki)
- Preparation for Construction: workshop space, instrumentation 1 (wiki)
- Construction instrumentation 2 (wiki)
Meeting Agenda
- Project Overview
- Scope of contract and current review
- Status of construction
- Tour of the Construction Facilities.
- Technical Documents Review. Topics to be covered in going through the documents include the following.
- Final Construction Plan
- Quality Assurance Plans and Acceptance Test Plans
- Testing procedures
- Documentations and Travelers
- Personnel training
- Schedule and Tracking
- Video meeting with Jlab and UConn Financial people.
- Billing and Reporting
- Continue Document Review (if needed).
- Closeout
- Adjourn
Microscope Information
Contract Related Documents
Quality Assurance and Acceptance Test Plan
Specification of the Microscope Detector and Readout Electronics
Specification of the Active Collimator and Electronics
Milestones for the Microscope Detector