Difference between revisions of "February 15, 2013 Installation"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == Friday, February 1, 2013 at 1:30pm At Jefferson Lab, the meeting will be held in ??? F326 ??? == Connections == To connect from the outside...") |
|||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
+ | |||
== Meeting Time and Place == | == Meeting Time and Place == | ||
Friday, February 1, 2013 at 1:30pm | Friday, February 1, 2013 at 1:30pm | ||
Line 17: | Line 18: | ||
# Tim and Eugene will complete the installation schedule for the Lehman review and this will form the basis of our installation schedule. | # Tim and Eugene will complete the installation schedule for the Lehman review and this will form the basis of our installation schedule. | ||
− | # Curtis will ask everyone delivering a detector component to JLab to write down what they see | + | # Curtis will ask everyone delivering a detector component to JLab to write down what they see occurring from the time the detector is delivered until it is installed an cabled up. |
# Beni agreed to create a <i>shopping list</i> for the CDC of items that would be needed at CMU to carry out a test involving between 3 and 7 125MhZ Flash ADCs. This would include low- and high- voltage systems as well as the Flash modules. | # Beni agreed to create a <i>shopping list</i> for the CDC of items that would be needed at CMU to carry out a test involving between 3 and 7 125MhZ Flash ADCs. This would include low- and high- voltage systems as well as the Flash modules. | ||
# We will ask at the Wednesday meeting about groups sending manpower to Jefferson Lab. | # We will ask at the Wednesday meeting about groups sending manpower to Jefferson Lab. |
Revision as of 12:51, 31 January 2013
Meeting Time and Place
Friday, February 1, 2013 at 1:30pm At Jefferson Lab, the meeting will be held in ??? F326 ???
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone (supported on request only) dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Action Items From Last Fall
- Tim and Eugene will complete the installation schedule for the Lehman review and this will form the basis of our installation schedule.
- Curtis will ask everyone delivering a detector component to JLab to write down what they see occurring from the time the detector is delivered until it is installed an cabled up.
- Beni agreed to create a shopping list for the CDC of items that would be needed at CMU to carry out a test involving between 3 and 7 125MhZ Flash ADCs. This would include low- and high- voltage systems as well as the Flash modules.
- We will ask at the Wednesday meeting about groups sending manpower to Jefferson Lab.
- The next installation meeting will be on Monday December 10 at 1:30pm.
Agenda
- Announcements
- Review of Last Recorded Action Items
- Status Reports from Participating Teams
- In which areas do we need coordination?
- What are urgent tasks?