Difference between revisions of "Microscope Fabrication Readiness Review"
From GlueXWiki
(→UConn) |
(→Meeting Agenda) |
||
Line 50: | Line 50: | ||
* 9:00 Tour of the Construction Facilities (UConn). | * 9:00 Tour of the Construction Facilities (UConn). | ||
− | * 10:00 Project Overview | + | * 10:00 [[Media:scope_readiness_review.pdf | Project Overview]] |
** Scope of contract and current review | ** Scope of contract and current review | ||
** Status of construction | ** Status of construction |
Revision as of 10:37, 7 February 2013
Contents
Date and Time
February 7, 2013
Video Connection information if needed
JLab Conference Room L102
- ESNET and EVO session
- Phone only if requested:
- +1-866-740-1260 : US
- access code: 3421244# (remember the "#"). Phone line by request only.
Participants
UConn
- Richard Jones (Professor of Physics)
- James McIntyre (graduate student)
- Alex Barnes (graduate student)
- Brendan Pratt (graduate student)
- Ann Marie Carroll (lab technician)
- Jonathan Kulakofsky (undergraduate student)
JLab
- Fernando Barbosa (Hall D eletrical engineer)
- Eugene Chudakov (Hall D group leader)
- Hovanes Egiyan (Hall D Staff)
- Bruce Lenzer (JLab ESH&Q)
- Elton Smith (Hall D Staff)
- Alexander Somov (Hall D Staff, SOTR)
- Timothy Whitlatch (Hall D engineer)
- Igor Senderovich (ASU postdoc, formerly in UConn group)
- Jarrod Fitzpatrick (CFO)
Topics/Issues that need discussion/resolution
Documents on the Microscope Construction
- Folder with UConn walk-through videos and presentations
- Drawings (wiki) Short list of updated drawings:
- Electronics (wiki)
- Microscope construction (wiki)
- Preparation for Construction: workshop space, instrumentation 1 (wiki)
- Construction instrumentation 2 (wiki)
Meeting Agenda
- 9:00 Tour of the Construction Facilities (UConn).
- 10:00 Project Overview
- Scope of contract and current review
- Status of construction
- 10:30 Technical Documents Review. Topics to be covered in going through the documents include the following.
- Final Construction Plan and Facilities
- Testing procedures
- Quality Assurance Plans and Acceptance Test Plans
- Documentation and Travelers
- Personnel training
- Schedule and Tracking
- 1:00 Video meeting with Jlab and UConn Financial people.
- Billing and Reporting
- 2:00 Continue Document Review (if needed).
- 2:30 Closeout
- 3:00 Adjourn
Microscope Information
Contract Related Documents
(use gluex account to access files)
Quality Assurance and Acceptance Test Plan
Specification of the Microscope Detector and Readout Electronics
Specification of the Active Collimator and Electronics
Milestones for the Microscope Detector