* '''Conditions database''' | * '''Conditions database''' | ||
** Develop conditions database. | ** Develop conditions database. | ||
− | ** estimate | + | ** estimate 4 man-weeks effort |
** Status: | ** Status: | ||
*** Mark has design, Dmitry will probably implement this. | *** Mark has design, Dmitry will probably implement this. | ||
Line 106: | Line 106: | ||
* '''Run bookkeeping scripts''' | * '''Run bookkeeping scripts''' | ||
** Develop scripts to store pre- and post-run information in online databases. | ** Develop scripts to store pre- and post-run information in online databases. | ||
− | ** estimate | + | ** estimate 4 man-week effort |
** Status: | ** Status: | ||
*** Most if not all can be stored in the to-be-developed conditions database. | *** Most if not all can be stored in the to-be-developed conditions database. | ||
Line 134: | Line 134: | ||
** estimate 12 man-weeks effort. | ** estimate 12 man-weeks effort. | ||
** Status: | ** Status: | ||
+ | |||
* '''Info Server for generic information storage and retreival''' | * '''Info Server for generic information storage and retreival''' |
Revision as of 17:14, 12 March 2013
Contact Elliott Wolin (wolin@jlab.org) for more details.
Contents
[hide]12GeV (High Priority) Projects Suitable for Outside Groups
- Event display
- Fully develop online event display using bCNU, EVE or other framework.
- estimate 22 man-weeks effort.
- Status:
- Have working (preliminary) version using bCNU framework (CNU students).
- Have proof of concept using EVE (Dmitry).
- Event monitoring
- Develop JANA framework for RootSpy-enabled online monitoring, collect detector histogram plugins from detector groups.
- estimate 8 man-weeks effort.
- Status:
- Elliott W has plugin templates.
- Northwestern Univ. interested.
- RootSpy Histogram archive/retrieval
- Develop histogram archive/retrieval system for the RootSpy system.
- estimate 5 man-weeks effort.
- Status:
- Prototype RootSpy system exists.
- Northwestern University interested.
- Process monitoring
- Develop process monitoring system.
- estimate 4 man-weeks effort.
- Status:
- Have example from CLAS.
- Hardware monitoring
- Develop computer hardware monitoring system.
- estimate 6 man-weeks effort.
- Status:
- Vardan has many ideas.
- EPICS gui's using Control System Studio
- Develop many EPICS gui's.
- estimate 8 man-weeks effort.
- Status:
- A few developed by Hovanes, Nerses, Vanik and Beni.
- SNS EPICS alarm system (BEAST)
- Test and make recommendation for implementation.
- estimate 4 man-weeks effort.
- Status:
- SCONS ("make" replacement)
- Develop online build system using SCONS.
- estimate 4 man-weeks effort.
- Status:
- Start with Maurizio's system for CLAS12.
12GeV (High Priority) Projects Suitable for Local Groups
- Computer monitoring/alarm system
- Learn about Ganglia, NAGIOS and similar systems, choose one and implement.
- estimate 4 man-weeks effort
- Status:
- Paul Letta will probably do this.
- Conditions database
- Develop conditions database.
- estimate 4 man-weeks effort
- Status:
- Mark has design, Dmitry will probably implement this.
- Farm manager CODA component
- Develop CODA component capable of managing monitoring of level 3 farm system.
- estimate 7 man-weeks effort
- Status:
- Vardan will probably do this.
- Front end readout lists
- Develop a generic readout list scheme capable of detecting which boards are in a crate and reading them out efficiently.
- Must implement only those boards listed in operator-chosen trigger configuration.
- Must also document configuration in Hall D database.
- estimate 6 man-week effort.
- Status:
- Bryan developed crate scan software.
- Alarm system
- Implement experiment alarm system based on recommendations (earlier task).
- estimate 8 man-weeks effort.
- Status:
- Current best choice seems to be BEAST from SNS.
- Run bookkeeping scripts
- Develop scripts to store pre- and post-run information in online databases.
- estimate 4 man-week effort
- Status:
- Most if not all can be stored in the to-be-developed conditions database.
- Out of band events
- Develop server to insert out-of-band events into the event stream.
- estimate 6 man-week effort.
- Status:
- Same idea as was done for CLAS.
- Translation table
- Implement translation table in JANA.
- estimate 3 man-week effort
- Status:
- Prototype translation table exists.
Other (Low Priority) Projects Suitable for Outside Groups
- Remote monitoring of experiment
- Develop system to allow remote monitoring of histograms, EPICS data, etc.
- May be different mechanism for EPICS data, hist, etc.
- estimate 12 man-weeks effort.
- Status:
- Info Server for generic information storage and retreival
- Investigate and define role for generic cMsg-based info server (a la CLAS), implement if useful.
- estimate 2 man-weeks effort design, 6 man-weeks implement.
- Status:
- Level 3 algorithm
- Develop L3 rejection algorithm for use in JANA online framework.
- estimate 26 man-weeks effort.
- Status:
- MIT group is interested and has experience from LHCb.
- RootSpy development
- Further develop RootSpy package, including mini-HBook feature.
- estimate 6 man-weeks effort.
- Status:
- See Dave L's note for suggested improvements.
- Summer student worked on mini-HBook.
- Northwestern Univ. interested.
Other (Low Priority) Projects Suitable for Local Groups
- Top-level experiment control control system and gui
- Develop top-level experiment control configuration and associated gui.
- Combines run control and slow controls into one interface.
- estimate 6 man-week effort.
- Status:
- Vardan best suited to do this, not needed unti after 2015.
- Event stream reorderer
- Develop code to reorder events after monitoring or level 3 farm.
- estimate 4 man-week effort.
- Status:
- Not sure this is needed.
In progress
- Event disentangler
- Develop Hall D specific event disentangler capable of handling full luminosity.
- Determine where it should run (ROC, EB, both?).
- estimate 6 man-week effort.
- Status:
- Carl best choice, he's done some work on this already.