Difference between revisions of "March 27, 2013 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(Hardware Agenda)
(Hardware Agenda)
Line 19: Line 19:
 
# CDC Update
 
# CDC Update
 
# No Cost Extension to Contract??
 
# No Cost Extension to Contract??
 +
## I have received emails on the contract coming to an end?
 
# Installation Details
 
# Installation Details
 
## Based on the last installation meeting, it became clear that the FDC installation could move forward to parallel the electronics installation. Discussion of this point prior to the Friday meeting.
 
## Based on the last installation meeting, it became clear that the FDC installation could move forward to parallel the electronics installation. Discussion of this point prior to the Friday meeting.
  
 
== Minutes ==
 
== Minutes ==

Revision as of 09:02, 26 March 2013

Meeting Time and Place

Wednesday March 27, 2013 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcement
  2. FDC Update
  3. CDC Update
  4. No Cost Extension to Contract??
    1. I have received emails on the contract coming to an end?
  5. Installation Details
    1. Based on the last installation meeting, it became clear that the FDC installation could move forward to parallel the electronics installation. Discussion of this point prior to the Friday meeting.

Minutes