Difference between revisions of "Fast Monitoring System - PXI"
From GlueXWiki
(→Reboot EPICS Service for ROOTFile Recording) |
(→How to Analyize ROOT Files) |
||
Line 62: | Line 62: | ||
# Check ROOTFile recording again | # Check ROOTFile recording again | ||
− | + | == How to Analyize ROOT Files == | |
− | + | === List of ROOT Files === | |
* [https://halldweb1.jlab.org/elog-halld/wing/41 entry on HallD-ELog] | * [https://halldweb1.jlab.org/elog-halld/wing/41 entry on HallD-ELog] |
Revision as of 20:10, 30 April 2013
Contents
- 1 Overview
- 2 Channel List
- 3 Communication with EPICS
- 4 Communication with PLC
- 5 EPICS Data
- 6 How to Run the EPICS Control
- 6.1 Start EPICS Control
- 6.2 Use EPICS Control
- 6.2.1 Main Screen
- 6.2.2 To Start DAQ
- 6.2.3 Calculate Offsets
- 6.2.4 Reset Offsets
- 6.2.5 Generate Fake Turn-to-Turn Short Alarm
- 6.2.6 Open Strip Charts for Voltage Taps
- 6.2.7 Open Strip Charts for Total Voltage and Ratios of Voltages
- 6.2.8 Start or Stop ROOTFile Recording
- 6.2.9 Reboot EPICS Service for ROOTFile Recording
- 7 How to Analyize ROOT Files
Overview
Channel List
Communication with EPICS
Communication with PLC
EPICS Data
How to Run the EPICS Control
Start EPICS Control
- Log onto gluon01.jlab.org using username halld from any Linux terminal, ask Elliott if you do not know the password.
- Type css & to start the Control System Studio.
- If PXI control is not already loaded, click File -> Open File in the top left menu, open ~halld/CSS-Workspaces/Default/Hall-D/PXI/PXI_Status.opi.
Use EPICS Control
Make sure that the PXI's heart beat is blinking, and all the EPICS channels are connected
Main Screen
The main screen give you the accesses to PXI control, ROOTFile Recording, strip-charts for CPU usage,magnetic current, field strength, pickup coil signals and buttons to open other strip-charts for sub coil voltages and voltage ratios.
To Start DAQ
- By default, the PXI-DAQ should be running, if not, hit Start to start the DAQ process, you should see that the status changes from System Standby to Initialize DAQ to DAQ Running
Calculate Offsets
- Make sure magnet is in a state that the all signals remain zero,
- Stop running DAQ proccess by hitting Stop,
- Click zero button to start zeroing process, the status will change from System Standby to Initizalize to Zeroing. After about 1 minute, the zeroing process should automatically stop and System Standby should be shwon then.
Reset Offsets
- Stop DAQ
- Click Reset Offset button
- Start DAQ
Generate Fake Turn-to-Turn Short Alarm
- The feature only works during a normal DAQ process
- Click T-2-T Alarm to trigger an alarm
- Click T-2-T Alarm again to return to disable the fake alarm
Open Strip Charts for Voltage Taps
- Click Open Sub Coil Chart
Open Strip Charts for Total Voltage and Ratios of Voltages
- Click Open Voltage Chart button
Start or Stop ROOTFile Recording
- ROOT Files need to be recorded for offline analysis, start a new ROOTFILE everytime a new ramp up starts from 0 A.
- Check the status of ROOT File Recording, if it says Idle .. Click to start new file, then click the button, acknowledge the popup message to start a new ROOTFile. The button should then say Writing Data .. Click to stop.
- Then one need to check the existance of the new file. First log onto gluon01 from a Linux terminal, then type ll -h /local/scratch/PXI_DATA/ROOT/*.root to display the list of availble root list, try to find the file with latest time stamp, also repeat the command a couple of more times make sure the file size is increasing.
- If ROOT file is not updating, one need to restart the EPICS IOC service for recording.
- Stop ROOTFile writing by click the button after the current ramps down to 0 A.
Reboot EPICS Service for ROOTFile Recording
- Log onto gluon01,
- Type telnet localhost 26060 to coonect to the service,
- Hit Ctrl+X to reboot it, reboot it a couple more time to make sure no error messages coming out,
- Hit Ctrl+] to quit telnet
- Check ROOTFile recording again